Power Plants Symposium 2008

Power Plants Symposium 2008

LIST OF ACCEPTED PAPERS

List of accepted abstract for the Symposium

  • Ene BARBU - INCDT COMOTI, Iuliu Maniu 220D, Bucharest, 061126, ROMANIA

    » RESEARCH ON SUPERHEATING SYSTEM OF STEAM TO 2xST 18 COGENERATIVE POWER PLANT

    submitted by: barbu
    Abstract text

    In a heat recovery steam generator used to produce superheated steam, of the cogenerative power plant, the superheater is usually a surface heat exchanger in which the two thermal agents are the combustion gases and steam. Considering the working conditions of the superheater and increasing trends of power group parameters, is necessary to pay a special attention to the design and its operation. Cogenerative power plant 2xST 18 - Suplacu de Barcau simultaneously produces electrical and thermal power and is the first product of its kind equipped with turboengines, designed and built entirely in Romania by the Romanian experts. It was put in full operation in 2004 and comprises two cogenerative lines, equipped with afterburning installations. This also confers a high degree of adaptability to the requirements of thermal power caused by the extraction process of crude oil deposit. The cogenerative power plant works in three variants of operation: turboengine + afterburning installation + heat recovery steam generator, turboengine + heat recovery steam generator, heat recovery steam generator + afterburning installation. Normally, the steam superheating temperature is difficult to determine on the theoretical path with sufficient precision, the air excess and the combustion gases recirculation having an influence on flame temperature and the temperature distribution into the heat recovery steam generator. If the steam preheating temperature is too high, this may create problems with superheating of tubes walls of the superheater. If it is too low, you cannot reach the overheating steam temperature required by the process. Only a calculation model based on experience of similar units can be considered satisfactory, the used mathematical formulas being not at all simple. Starting from the description of constructive and functional solution of 2xST 18 cogenerative power plant, this paper is dealing with the related problems on the system of steam superheating (the superheater and steam temperature regulation) occurred at putting into operation of the plant and their resolve, in correlation with the installation requirements and the afterburning process.

  • Dragoljub B. Radojičić - Zavod za zavarivanje, Beograd, Srbija

    » UTVRĐIVANJE TRENUTNOG STANJA ELEMENATA PAROVODA NA TERMOELEKTRANAMA KONVENCIONALNIM I NOVIM METODAMA ISPITIVANJA BEZ RAZARANJA-NOVI PRISTUP

    submitted by: dragoljubradojicic
    Abstract text

    Rad analizira novi pristup ispitivanja metodama IBR i izradu plana obima ispitivanja radi ocene tranutnog stanja elemenata parovoda. Novi pristup podrazumeva „PRETHODNU“ dijagnostiku metodom magnetnog pamćenja metala na osnovu čega se izrađuje konkretan plan koji obuhvata vrste i obim ispitivanja konvencionalnim metodama IBR.

    Analizom nalaza metodama IBR se dolazi do ocene stanja ispitnog elementa parovoda.

    Analizom nalaza „PRETHODNOG“ ispitivanja može se informativno doći do procene preostalog radnog veka.

  • Slobodan V. Laković - Mašinski fakultet Niš, ul. A. Medvedeva 14, 18000 Niš, Mirjana S. Laković - Mašinski fakultet Niš, ul. A. Medvedeva 14, 18000 Niš

    » PERSPEKTIVA PRIMENE PANELNOG RASHLADNOG TORNJA ZA HLAĐENJE TERMOELEKTRANE

    submitted by: lakovic
    Abstract text

    Zbog veće temperature rashladne vode, specifična potrošnja toplote za oko 5% je veća kod termoelektrana hladjenih vlažnim rashladnim tornjevima sa filmskom ispunom i prirodnom cirkulacijom vazduha u poređenju sa termoelektranama hlađenim protočnom vodom.

    Ispuna panelnog rashladnog tornja ima širinu kanala između dve susedne ploče 12-20mm, zbog čega je površina prenosa toplote i mase značajno veća u odnosu na standardne ispune, a režim strujanja vode i vazduha povoljniji. Zbog toga panelni rashladni tornjevi imaju znatno manju visinu zone hlađenja vode u poređenju sa tornjevima koji su danas u primeni. To dozvoljava niži vakuum u kondenzatoru, pa bi se ovako hladjeni parni blok po karakteristikama približio protočno hlađenom postrojenju. Činjenica da investicioni i eksploatacioni troškovi nisu veći nego za konvencionalni toranj takođe preporučuje ovaj tip tornja za znatno širu primenu.

    U radu je pokazano na primeru referentnog postrojenja koliko je zamena konvencionalnog tornja panelnim smanjila specifičnu potrošnju toplote, odnosno povećala energetsku efikasnost postrojenja.

  • Dobrica Filipović - NIS-Naftagas, Novi Sad, Branislav Perković - ACTA, Novi Sad

    » MOGUĆNOST RACIONALNOG KORIŠĆENJA ENERGETSKIH RESURSA ZA PROIZVODNJU ELEKTRIČNE I TOPLOTNE ENERGIJE

    submitted by: dobricafilipovic
    Abstract text

    Postojeći energetski sistem zemlje opterećen je nizom problema koji uslovlajvaju smanjenu konkurentnost na tržištu energije. Pri tome, odlučujući uticaj na konkurentnost i profitabilno poslovanje ima efikasnost proizvodnje električne energije, a pre svega TE-ugalj, čiji je udeo u ukupnoj proizvodnji električne energije veliki (67%), a efikasnost mala 28 – 29 %. Posledica toga je neracionalno korišćenje domaćeg resursa uglja, jer se degradira i nepovratno gubi energija oko 3.2 Mten/god, što odgovara godišnjem uvozu nafte. Tome svakako treba dodati visoke gubitke u prenosu i distribuciji električne energije oko 18 %, ili oko 5500 GWh/god., što odgovara proizvodnji TE od oko 850 MWe.

    Istovremeno, energetski efikasne TE-TO (ηu = 0.6 – 0.85) su zanemarene i učestvuju u proizvodnji električne energije sa samo oko 2-3 % . Ovakav odnos prema TE-TO proističe iz dispariteta cena energenata i energije, ali i iz stava da je cena električne energije veća od cena iz TE-ugalj. Naznačeni stav, svakako, je potrebno preispitati.

    U ovakvim okolnostima EPS predvidja novi investicioni ciklus sa ciljem izgradnje novih elektroenergetskih kapaciteta. To se odnosi, pre svega, na izgradnju TE-ugalj instalisane snage 750 MWe, ali ima i najava korišćenje prirodnog gasa za pogon TE-TO. Nažalost, iz nepoznatih razloga, mazut kao pogonsko gorivo za TE-TO nije uzet u obzir iako se očekuje značajna produkcija od 800.000 – 1.000.000 t/god.

    Stim u vezi nije sporna potreba izgradnje naznačenog kapaciteta, nego moguće lokacije, vrsta pogonskog goriva, energetska efikasnost, primenjena energetska tehnologija i ko će preuzeti status investitora. Ovo se naročito ističe kada se ima uvidu da je poboljšanje energetske efikasnosti moguće korišćenjem visokoefikasne energetske tehnologije – kogeneracije tj. izgradnjom TE-TO.

    Shodno prednje izloženom, postavlja se pitanje da li je energetski i ekonomski celishodnije investirati u TE-ugalj 750 MWe ili u izgradnju većeg broja manjih TE-TO (pogon sa gasom i/ili mazutom) iste snage lociranih u blizini gradova i naselja, gde je moguć plasman tj. prodaja oba oblika proizvedene električne i toplotne energije. Odgovor na ovo pitanje, odnosno, kakvi se efekti očekuju, može ustanoviti energetska ekonomija tj. energetsko-ekonomska efikasnost.

    Za tu svrhu koristi se novo razvijeni tehno-ekonomski model koji omogućava prethodne brze kalkulacije u domenu inženjerskih procena za proračun cene proizvedene energije, kao polaznog elementa za utvrđivanje perioda isplativosti investicije tj. ekonomije proizvodnje transformisane energije.

    Istovremeno korišćenjem ovog modela moguće je ispitati osetljivost cene proizvedene energije ( električne i toplotne ) na brojne uticajne faktore kao osnove za opredeljenje racionalnijeg i isplativijeg investicionog rešenja.

  • Trbojevic Nebojsa - Vattenfall Europe PowerConsult East

    » CONTINUITY OF INTERNATIONAL LARGE SCOPE PROJECT IMPLEMENTATION & HANDLING OUT BY LOCAL AND EPS OWN RESOURCES

    submitted by: T.Nesh-BG
    Abstract text

    KONTINUITET IMPLEMENTACIJE VELIKIH MEĐUNARODNIH PROJEKATA I NJIHOVO SPROVOĐENJE LOKALNIM I RESURSIMA ELEKTROPRIVREDE SRBIJE

    [TE NIKOLA TESLA A, BLOK A4: KAPITALNI REMONT 2007]

    CONTINUITY OF INTERNATIONAL LARGE SCOPE PROJECT IMPLEMENTATION & HANDLING OUT BY LOCAL AND EPS OWN RESOURCES

    [TPP NIKOLA TESLA A, UNIT A4: GENERAL OVERHAUL 2007]

    Trbojević M. Nebojša Autor, Đorđi Biljanovski Koautor

    Vattenfall Europe PowerConsult East, Beograd

    PD“ Termoelektrane Nikola Tesla“ d.o.o. Obrenovac

    Abstract: This paper is presenting second and hopefully not the last part of the previous document presented onto the same symposium during the year 2006 and dedicated to TPP Nikola Tesla B1 Overhaul 2005.

    Throughout the recent period, lots of international projects linked to the Power Plants Rehabilitation and General Overhaul have been executed in Serbia. Majority has been covered/ supported by the Financing Institutions out of the State.

    Bearing in mind that there is already established policy by these institutions (e.g. World Bank, EBRD, EAR, KfW ...) to cover the Project(s) from their own funds by international Consultants engagement, suitable option for the Local Personnel/ Management to have so called “Learning Experience” has been widely utilized.

    Having above mentioned facts as background, throughout the period 2005-2006, it has been decided by the EPS Authorities to perform one huge project, similar or even larger comparing to the above said, funded by its own.

    The full scope has been executed the Thermal Power Plant Nikola Tesla A, Unit 4 (308.5 MW).

    Subjected Project has been fully managed by local project members/ experts, supported by EPS.

    The aim of this paperwork is to familiarize other symposium participants with the manner of Feasibility, Overall Forecasting, Invitation to Tender, Contracting, Contract execution procedure(s) and (has to be said) very successful accomplishment of the Project.

    Mentioned Project scope has been divided into the Seven (7) Lots.

    Two international and five local companies have been included into the Project Execution.

    Overall Budget that covers Goods and Services has been estimated as over €80 millions.

    No delays have been registered regarding the Project carrying out and main Milestones.

  • Prof.dr Vera Šijački Žeravčić, dipl.inž.met. - Mašinski fakultet Univerziteta u Beogradu, mr Gordana Bakić, dipl.inž.maš. - Mašinski fakultet Univerziteta u Beogradu, mr Miloš Đukić, dipl.inž.maš. - Mašinski fakultet Univerziteta u Beogradu, Bratislav Rajičić, dipl.inž.maš. - Mašinski fakultet Univerziteta u Beogradu

    » NEDOSTACI ZAKONA O JAVNIM NABAVKAMA I ŠTETE PROUZROKOVANE NJEGOVOM PRIMENOM KOD KOTLOVA DOMAĆIH TERMOENERGETSKIH POSTROJENJA

    submitted by: vsijacki
    Abstract text

    Iako je danas popularno govoriti o kvalitetu proizvoda i procesa generalno i pri tome se pozivati na brojne standarde, preporuke i norme, ponekad izgleda da je to samo fasada a svakako i pokriće za proizvođače i trgovce, bar kada je reč o materijalu različitih kotlovskih cevi za termoenergetska postrojenja, da mogu da isporučuju materijale neprihvatljivog kvaliteta. Da bi to bilo moguće bilo je neophodno promeniti postojeće standarde koji se tiču materijala za termoenergetsku opremu na takav način ne samo da su maksimalno zaštićeni već i da se neka krucijalna ispitivanja potpuno izbace iz upotrebe ili se uopšte ne primenjuju pri kontroli kvaliteta materijala/proizvoda pre isporuke. Naravno, ne treba zaboraviti da se standardi prave prema velikim proizvođačima opreme. Svakako, ako kupac opreme želi da dopunski proveri kvalitet materijala koji će da ugradi u svoje postrojenje, on to može da zahteva u ugovoru (i tu postoje određena oganičenja) ali uz određenu cenu. Situacija možda i ne bi bila tako loša da postojeći zakon o javnim nabavkama nema određene nedostatke – mora da se prihvati ona ponuda koja je najjeftinija, bez obzira da li kod kupca opreme postoji saznanje da ta oprema nije kvalitetna i da će njenom ugradnjom da se poveća broj otkaza postrojenja. Cilj ovog rada je da prikaže nove probleme (kao da ih nema dovoljno) naših termoenergetskih postrojenja zbog nabavke materijala po propisima zakona o javnim nabavkama i njihove ugradnje.

    INADEQUACIES OF THE PUBLIC TENDERS AND DAMAGES CAUSED WHEN USED ON THE DOMESTIC THERMAL POWER BOILERS

    Abstract: Although it is a common practice to speak in general about the quality and production process of a product and at the same time invoking numerous standards, recommandations and norms, it would appear that this is only a facade used by the producers and salesmen of the inadeaute quality materials to cover-up the real issues dealing with the bolier tubes used in the thermal power stations. In order to achieve this goal it was necessary to change the existing materials standards for the thermal power equipment not only to provide the maximal protection for the supplier but also to completly eliminate the crucial testing procedurs or to make these unapplicable for the qualty control of the materials/products before delivery. Natrurally, it should not be forgotten that the standards are made to suit the major suppliers of the products. Clearly if the buyer desires to conduct additional tests in order to verify the materials quality to be built in the respective equipment he can stipulate this in the initial contact (for which there are certain limitations) but for a price. The situation may be as bad as it may appear providing the exisiting laws covering the public purchases is not flawed that is that the lowest offer has to be accepted irrespective of the fact as to whether the buyer is aware of the poor quallity that can lead to an increased number of outages. The aim of this work is to point out to the new problems (as if there are not enough) encountered by our termal power equipments when purchasing the materials in accoradance with the public purchasing practices and their installation.

  • mr Gordana Bakić - Mašinski fakultet Univerziteta u Beogradu, Ljubinka Vujnović - PD TE Nikola Tesla, Miloš Vlajić - PD TE NIkola Tesla

    » MOGUĆI PROBLEMI U EKSPLOATACIJI ZAVARENIH SPOJEVA ČELIKA P91 I NISKOLEGIRANIH TOPLOTNOPOSTOJANIH ČELIKA

    submitted by: gordana.bakic
    Abstract text

    Apstrakt: Prema dosadašnjim iskustvima u primeni relativno novog čelika sa 9% Cr iskristalisala se njegova »delikatna priroda« i po pitanju njegove proizvodnje, ali i po pitanju zavarivanja. Posebna nepoznanica su zavareni spojevi između niskolegiranih CrMoV čelika i čelika P91, pre svega što su sve preporuke date na osnovu ispitivanja izvedenih za zavarene spojeve koji su kombinacija 2,25 Cr1Mo – P91 čelika sa dodatnim materijalom koji odgovara ovim čelicima. Za zavarene spojeve koji su kombinacija čelika klase CrMoV – P91, tehnologije zavarivanja ne predviđaju uvek izmenu dodatnih materijala i temperatura termičke obrade, iako CrMoV čelici imaju znatno bolje vremenske osobine od čelika klase 2,25Cr1Mo. Ovaj rad ima za cilj osvetljavanje ovog problema, što je od značaja za naša revitalizovana postrojenja, kod kojih su novi parovodi mahom, iz tehnoekonomskih razloga, izvedeni kao kombinacija cevi od CrMoV čelika i fazonskih komada od čelika sa 9%Cr. Posebna pažnja je biti posvećena anomaliji koja generalno nastaje kod raznorodnih zavarenih spojeva između niskolegiranih čelika i čelika sa 9%Cr – mekoj zoni razugljeničanje na strani čelika sa nižim sadržajem hroma. Ponašanje ove zone u dužem vremenskom periodu (npr. 100000 h ili 200000 h koliki je projektni vek novih parovoda), je pod velikim znakom pitanja zbog njenih loših karakteristika otpornosti, što posebno ima značaja kod zavarenih spojeva kod kojih se u radu generišu značajni sistemski naponi.

    POTENCIAL EXPLOITATION PROBLEMS OF DISSIMILAR WELDED JOINTS P91 STEEL - LOW ALLOY HEAT RESISTANTE STEELS

    Abstract: The existing expereince with the use of steel containing 9% Cr has revealed its 'delicate nature' not only in reagard to its production but also its weladability. Of particular interest are dissimilar welded joints between the low-alloyed CrMoV steels and P91 steel since all the recommendations are made based on the testing of welded joints made of combination 2,25 Cr1Mo – P91 with additions corresponding to these steels. For the welded joints made with the steels CrMoV – P91 the welding technologies do not provide changes in the contact of the added materials and thermal treastment temperature despite tha fact that CrMoV steels have superior againg characteristics as compared with the 2.25 Cr1Mo class. The aim of this work is to enlighten the nature of this problem which is essential for the revilization of our thermal stations with hig pressurize pipings which are, for techoeconomical reasons, made using a combination of CrMoV steel pipes and steel pieces containing 9%Cr. Particular atetnion is given to the anomaly which generally occurs with the welds between low-allyed steels and steel with 9% Cr in the soft carbon depleted zone at the side os steel having lower Cr content. Due its poor mechanical charactersitics the behavior of this zone over a long period of time (for instance 100000 h or 200000 h corresponding to the designe piping life) is questionable which is of considerable importance with the welded joints subjected to consideable system stresses.

  • mr Gordana Bakić - Mašinski fakultet Univerziteta u Beogradu, Prof.dr Vera Šijački Žeravčić - Mašinski fakultet Univerziteta u Beogradu, mr Miloš Đukić - Mašinski fakultet Univerziteta u Beogradu, Bratislav Rajičić - Mašinski fakultet Univerziteta u Beogradu, Đorđi Biljanovski - PD JP TE Nikola Tesla, Predrag Đorđević - JP EPS Direkcija za strategiju i investicije

    » VOĐENJE ZAPISA O OTKAZIMA I KODIRANJE OŠTEĆENJA CEVNIH SISTEMA KOTLOVA TE POSTROJENJA U CILJU UTVRĐIVANJA I OTKLANJANJA GLAVNIH UZROKA OTKAZA

    submitted by: gordana.bakic
    Abstract text

    U ukupnom broju prinudnih zastoja termoenergetskih postrojenja u okviru Elektroprivrede Srbije, cevni sistemi kotlova imaju najveće učešće (preko 60%). Ovako velikom broju zastoja doprinosi niz faktora - od činjenice da su naša postrojenja uglavnom stara, preko goriva izrazitih erozivnih karakteristika, do niza drugih uticajnih faktore koji ni do danas nisu najjasnije identifikovani. Rešavanje pitanja učestalih propuštanja cevnih sistema kotlova neophodno je raditi sistematski, po toku koji je vrlo logičan i opšteprihvaćen u svetu. Jedan od prvih zadataka je kodiranje oštećenja pri vođenju zapisa o otkazima. U ovom radu poseban akcenat je stavljen na sistematizaciju otkaza, vođenje zapisa o otkazima i kodiranje oštećenja koja su izazvali otkaze cevnih sistema. Ispravnim vođenjem zapisa, moguće je izvući niz zaključaka o glavnim uzrocima koji su doveli do pojave otkaza, generalno o stanju pojedinačnih grejnih površina, ali i o stanju cevnog sistema posmatranog kotla. Takođe, tačno identifikovanje mehanizma oštećenja omogućuje primenu vrlo konkretnih mera za sprečavanje otkaza ili govori o tome kojom brzinom bi oštećenje moglo da se razvija i utiče na pouzdanost sistema u budućem radu. Uspostavljanjem adekvatne sistematizacije otkaza, na jednom postrojenju je moguće usmeriti mere održavanja i režim proizvodnje u pravcu otklanjanja uzroka i generalno, korektivne mere i odluke o eventualnoj zameni grejnih površina, zameniti preventivnim merama koje bi dalekosežno mogle da spreče pojavu velikog broja otkaza i budu osnova za uvođenje modernijih sistema održavanja.

    RECORDING AND CODING DAMAGES OF THE THERMAL POWER BOILER TUBING SYSTEMS AIMED AT DETERMING AND ELIMINATING THE MAIN CAUSES OF OUTAGES

    Abstract: The majority of the outages of the thermal power stations within the Elektroprivrede Srbije is due to the boiler piping system (over 60%). The cause for such a large number of outages is the fact that our power stations are basically old, with erosive coal as fuel, and also affected by a number of other factors that are still not indentified. To resolve this problem of unschceduled outages and failures of boiler piping system a widely accepted systematic approach to the problem is essential.

    One of the most important is tasks is damage coding to be used for the outage redordings.In this work particular attention was given to the systematization of the outages, evidencing the outages and coding the damages causing the failure of the boiler tubing systems. Proper documnetation of the outages provides determination of the main causes leading to the outages, the general state of the individual heating surfaces and also the boiler tubing system under scrutiny. In additions, damage mechanisms were identified thus enabling the application of the proper preventive measures as well as rate of damage was determined which can affect the future system reliabilty

    As follow up measures, it is possible to improve the measures of maintenance and regimes of production aimed eventaully of their removal as well as implementing corrective measures and eventual replacement of the heating surfaces using preventive measures which could in the future reduce boiler tube failure rate and be base for modern maintenace systems.

  • mr Miloš Đukić - Mašinski fakultet Univerziteta u Beogradu , Prof. dr Vera Šijački Žeravčić - Mašinski fakultet Univerziteta u Beogradu , mr Gordana Bakić - Mašinski fakultet Univerziteta u Beogradu , Bratislav Rajičić - Mašinski fakultet Univerziteta u Beogradu , Prof. dr Biljana Anđelić - Tehnički fakultet Čačak, Univerzitet u Kragujevcu

    » PREPORUKE ZA SMANJENJE BROJA OTKAZA NA CEVNIM SISTEMA KOTLOVA DOMAĆIH TERMOENERGETSKIH POSTROJENJA

    submitted by: miki166
    Abstract text

    Otkazi na cevnim sistemima kotlova domaćih termoelektrana i dalje predstavljaju jedan od glavnih uzročnika zastoja, kao i pada raspoloživosti i pouzdanosti celog postrojenja. Uzroci otkaza kotlovskog postrojenja su mnogobrojni a saznanje o tome koji je mehanizam oštećivanja kotlovskih cevi prouzrokovao otkaz vrlo malo znači sa eksploatacionog stanovišta bez informacije o stvarnim uzročnicima kao i stepenu i brzini razvoja oštećenja. Savremeni koncepti održavanja, zasnovani na radu do realnog iscrpljenja radnog resursa komponente/opreme, u svojoj osnovi imaju definisanje i vremenski dirigovano sprovođenje tehno-ekonomski optimizovanih preventivnih i prediktivnih mera održavanja. Međutim, koncept prediktivnog održavanja, koji se zasniva na praćenju kritičnih parametara procesa, ne može u potpunosti da ukaže na uzročnike kao i mogućnost pojave lokalnog razaranja kotlovskih cevi koje su tokom eksploatacije npr. izložene koroziji i eroziji kao i izrazito oštrim i nestacionarnim radnim uslovima. Iskustva iz eksploatacije savremenih termoenergetskih postrojenja u svetu ukazala su da je primena savremenih koncepta održavanja najčešće dala nepotpune rezultate, jer njihovom primenom nije moguće u potpunsti korigovati projektne i eksploatacione greške, detektovati prisustvo grešaka u materijalu i izradi, niti u potpunosti sprečiti organizacione i ljudske propuste u sprovođenju procesa vođenja i održavanja kotlovskog postrojenja. Cilj ovog rada je da ukaže na najčešće uzročnike otkaza na kotlovskim cevnim sistemima domaćih termoelektrana posebno sa aspekta korozije i erozije, definiše preporuke i smernice za smanjenje broja otkaza, kao i da istakne prednosti i ograničenja pojedinih pristupa u održavanju.

    Boiler tube failures still present one of the leading cause of forced outages of thermal fossil fuel power plants and lose of power plant availability and reliability. Boiler tube failure causes are numerous. Despite the fact that the majority of boiler tube damage mechanisms are relatively well clarified, individual information about damage mechanism is of limited interest from the plant operation point of view without information about actual root causes and rate of damage. Contemporary maintenance concepts like RCM and RBM are actually based on techno-economically optimized preventive and predictive measures whose practices are chronologically defined. A noticeable trend among many power plant utilities is the emphasis on maintenance improvement in general and predictive maintenance based on process indicators monitoring in particular. However applicability of preventive maintenance to the boiler tubing system was limited because majority of boiler tube failures are local failure due to hostile environment-corrosion/erosion or variable operating codition and hence using process indicators to detect them is not a simple task. Shortcomings of contemporary maintenance concepts are also connected to the fact that most tube failures are related to boiler and plant design flaws, operational changes and upsets or material and fabrication defects, and it stands to reason that they will occur at essentially random intervals due to usually different causes. The aim of this paper is to indicate on most frequent boiler tube failure causes on domestic thermal power plants (particularly from the aspects of corrosion and erosion), define recommendation measures for reducing of forced outages due to failure on boiler tubing system and also to emphasize the advantages and disadvantages of individual maintenance concepts and practice.

  • Miloš Milić - PD Termoelektrana “ Nikola Tesla ” d.o.o, Obrenovac, Zoran Stojanović - PD Termoelektrana “ Nikola Tesla ” d.o.o, Obrenovac, Milorad Jovanović - PD Termoelektrana “ Nikola Tesla ” d.o.o, Obrenovac

    » POVEĆANJE SNAGE, EFIKASNOSTI I POUZDANOSTI RADA BLOKOVA TE “NIKOLA TESLA B” (TENT-B)

    submitted by: mjovanovic
    Abstract text

    Imajući u vidu zahteve za podmirivanje povećane potrošnje električne energije u Republici Srbiji ( posebno u zimskim uslovima ), Rukovodstvo TENT- a donelo je odluku za realizaciju projekta EKO-RAM u cilju povećanja snage, efikasnosti i pouzdanosti rada blokova TENT- B.

    Na osnovu prethodno izvršenih proračuna, analiza i ispitivanja postrojenja blokova, došlo se do saznanja da je tehnički moguće ( pri određenim uslovima ) i ekonomski opravdano da se na blokovima TENT- B projektovane snage 2*620 MW, snaga poveća za 50 MW po bloku.

    Nakon izvršenih rekonstrukcija i podešavanja na bloku utvrdiće se parametri za optimalan rad blokova.

Power Plants Symposium 2008

SIMPOZIJUM ELEKTRANE 2008