Power Plants Symposium 2008

Power Plants Symposium 2008

LIST OF ACCEPTED PAPERS

List of accepted abstract for the Symposium

  • Dragan Kalaba - Fakultet tehničkih nauka Univerziteta u Prištini, Dejan Čikara - Fakultet tehničkih nauka Univerziteta u Prištini, Z. Nadeždin - Fakultet tehničkih nauka Univerziteta u Prištini, N. Čamagić - Fakultet tehničkih nauka Univerziteta u Prištini

    » ODREDJIVANJE VREMENSKE PERIODE PREVENTIVNOG ODRŽAVANJA KOTLOVSKOG POSTROJENJA U TERMOELEKTRANI GACKO

    submitted by: kalabadragan
    Abstract text

    Rad ima za cilj odredjivanje vremenskog perioda preventivnog održavanja na kotlovskim sistemima Termolektrane GACKO primenom TEORIJE POUZDANOSTI.

    Vremenska perioda preventivnog održavanja određena je na osnovu analize zastoja na kotlovskom postrojenju Termolektrane GACKO u periodu od 2000. do 2006. godine.

    Dobijeni rezultati eksploatacionim ispitivanjem potvrđeni su teorijski Vejbulovom raspodelom.

  • Thomas Ortner - Austrian Energy & Environment AG & Co KG, Gratz, Austria

    » COMBUSTION OF WASTE FUELS IN CFB BOILERS - LATEST DESIGN AND EXPERIENCE

    submitted by: thomasortner
    Abstract text

    Austrian Energy & Environment AG & Co KG has implemented two contracts for waste fired CFB boilers whose concept is mainly based on the reference plant RV Lenzing (Austria), which is still the largest CFB boiler (120 MWth) all over the world in operation for burning RDF (refuse derived fuel) and other waste fuels and that holds a world record on operating hours for such applications. Four additional contracts ranging from 95 to 150 MWth are being implemented by AE&E at present.

    Forced by official regulations as well as by the conditions and behaviour of the waste fuels a special design of the boiler has to apply with the following main features:

    • Adiabatic furnace in combination with an external heat exchanger

    • Hot gas cyclone combined with an adiabatic post combustion chamber

    • Vertical boiler radiation passes and horizontal tailend pass

    • Special fuel feeding system and open nozzle grid for fluidization

    As a consequence the CFB boiler provides an excellent performance including high fuel flexibility, very low emission figures, high efficiency etc.

  • Dr Radoslav Raković - Energoprojekt-Entel ad Beograd, Ivana Simović - Rudarski institut Beograd-Zemun

    » PRINCIPI IZBORA TEHNOLOGIJE ZA ON-LINE PRAĆENJE I UJEDNAČAVANJE KVALITETA UGLJA

    submitted by: rrakovic
    Abstract text

    Termoelektrane koje koriste ugalj kao gorivo predstavljaju jedan od najvećih emitera gasova sa efektom staklene bašte u svetu, pa i u našoj zemlji. Emisija ovih gasova zavisi od sastava uglja (u našim uslovima lignita), pre svega od sadržaja ugljenika, pa je neophodno analizirati raspoložive tehnologije za on-line analizu karakteristika uglja u cilju izbora najpovoljnije koja bi se mogla primeniti u procesu ujednačavanja kvaliteta, odnosno homogenizacije uglja za sagorevanje u termoelektranama. U radu je dat kratak pregled parametera kvaliteta uglja iz kolubarskog i kostolačkog ugljenog basena i tehničkih rešenja on-line analizatora kao i procedura za izbor najpovoljnijeg on-line analizatora za primenu u okviru sistema za kontinualno praćenje i ujednačavanje kvaliteta uglja. Posebna pažnja posvećena je uticaju homogenizacije kvaliteta uglja na energetsku efikasnost termoelektrana i emisiju ugljen dioksida.

  • Aleksandar Ribić - Institut Mihajlo Pupin

    » PID autotuning i primjenljivost u termotehnici

    submitted by: aribic
    Abstract text

    Danas je većina industrijskih regulatora opremljena procedurama za automatsko podešavanje parametara regulatora (autotuning). Za one koji nemaju ovu mogućnost na tržištu nalazimo širok spektar softvera za analizu i optimalno podešavanje regulacionih kontura. U radu je analizirano koliko ovakav softver stvarno može pomoći prilikom podešavanja regulatora u termotehnici, ali i ostalim granama industrije. Analiyirano je nekoliko primjera koji se često pojavljuju u termoenergetskim postrojenjima.

  • Dragoslava D. Stojiljković - Mechanical Engineering Faculty, University of Belgrade, Vladimir Jovanović - Mechanical Engineering Faculty, University of Belgrade, Nebojša Manić - Mechanical Engineering Faculty, University of Belgrade, Aleksandar Jovović - Mechanical Engineering Faculty, University of Belgrade

    » SADRŽAJ HLORA I FLUORA U UGLJU KAO UTICAJNI ČINILAC NA PROJEKTOVANJE POSTROJENJA ZA ODSUMPORAVANJE DIMNOG GASA

    submitted by: VladimirJovanovic
    Abstract text

    Rezime: Poslednjih godina, istraživanja procesa sagorevanja uglja sve više obuhvataju nečistoće u uglju, a posebno halogene elemente (F, Cl, Br, I i At). Tokom procesa sagorevanja halogeni elementi prelaze u kisele gasove koji stvaraju probleme kako u samim termoenergetskim objektima (problemi korozije), tako i u njihovoj okolini. U zemljama gde se ugalj najviše koristi za proizvodnju električne energije, ovo gorivo predstavlja i najveći izvor emisije hlorida u atmosferu. Iako se fluoridi nalaze vezani u mineralima, njihovo prisustvo u atmosferi potiče ili kao posledica vulkanskih aktivnosti ili iz procesa sagorevanja uglja. Emisija hlorida i fluorida iz procesa sagorevanja zavisi od sadržaja i oblika ovih elemenata u uglju, procesa sagorevanja i postrojenja za smanjenje emisije. Proučavanje sadržaja hlorida i fluorida u uglju i u dimnom gasu je posebno značajno pri projektovanju postrojenja za odsumporavanje dimnih gasova (ODG), sastavnog dela savremenih termoenergetskih postrojenja kojim se obezbeđuje zadovoljenje propisa o emisiji sumpornih oksida. U ovom radu dat je kratak pregled međunarodnih iskustava u vezi sa prisustvom hlora i fluora u uglju i problemima izazvanih njihovim prisustvom u dimnom gasu, kao i rezultata sopstvenih istraživanja obavljenih u okviru realizacije Studije „Dopunska geološka istraživanja na površinskom kopu Drmno – III faza”.

    Abstract: Recently, research in the field of coal combustion, more and more include impurities in coal, specifically halogen elements (F, Cl, Br, I i At). During the combustion process, halogen elements are transformed in acid gasses which impose problems to the power plants (corrosion), and to the surrounding environment. In countries where coal is mostly used for electricity production, this fuel is the greatest source of chloride emission to the atmosphere. Although the fluorides are bonded in the minerals, there presence in atmosphere originates either from the volcanic activities or from the coal combustion. Emission of chlorides and fluorides from the combustion depends on content and state of these elements in coal, combustion process and emission reduction equipment. Examination of chlorides and fluorides content in coal and in flue gas is particularly important for design of flue gas desulphurisation (FGD) plant, the integral part of the modern power plants which ensure meeting the requirements of sulphur dioxide emission regulations. This paper presents the short revue of international experiences related to chlorine and fluorine presence in coal and to the problems caused by their presence in flue gas, as well as the results of own research made during preparation of Study „Additional geological research on the open-pit mine Drmno – Phase III“

  • Branko Jevtić - JP Elektroprivreda Srbije, Direkcija za strategiju i investicije, Predrag Vukojičić - JP Elektroprivreda Srbije, Direkcija za strategiju i investicije

    » MODERNIZACIJA I EKOLOŠKA SANACIJA RUDARSKOG SEKTORA U SRBIJI UPOREDIVA SA ISKUSTVIMA DATIM MINSER PROJEKTOM

    submitted by: 012345
    Abstract text

    Sadržaj - U okviru MINSER projekta, koji je zasnovan na principima partnerstva privatnog i javnog sektora (Public Private Partnership) obavljena je razmena iskustava i dodatno usavršavanje stručnjaka, menadžera, predstavnika nauke i državnih organa iz Srbije, koji se bave rudarstvom i preradom uglja o modelima ekološke sanacije i modernizacije kod dobijanja sirovina i proizvodnje energije i to putem transfera znanja, praktičnih radionica, dijaloga i izgradnje mreža saradnje.

    Projekat se oslanja na opsežna iskustva nemačkih saveznih pokrajina Brandenburg i Saksonija u kojima je već uspešno sprovedeno restrukturiranje i modernizacija proizvodnje i korišćenja lignita i mrkog uglja.

    U ovom radu autori će predstaviti deo analize stanja rudarskog sektora kroz prizmu JP „Elektroprivreda Srbije“ u poređenju sa iskustvima dobijenim na radionicama MINSER. Održavanje radionica su zajedničkim snagama sa srpske strane omogućili Ministarstvo za rudarstvo i energetiku Republike Srbije, JP EPS i RGF iz Beograda.

    Abstract – Within the MINSER project, based on public private partnership principles, exchange of experience and additional training of experts, managers, representatives of scientific fields and government agencies dealing with mining and coal processing will be carried out in ecological refurbishment and modernisation during raw material production and electricity generation, through knowledge transfer, practical workshops, dialogues and cooperation network building.

    The project relies on comprehensive experience of German federal states of Brandenburg and Saxony, which successfully implemented restructuring and modernisation of lignite and brown coal production and utilisation.

    In this paper authors will present small analysis of current state in mining sector in PE Electric power industry of Serbia in comparison with received “know-how” from MINSER project workshops. Those workshops are provided by Ministry of mining and energy Republic of Serbia, PE EPS and Faculty of mining and geology from Belgrade.

  • Dušan Nenić - JP Elektroprivreda Srbije, Direkcija za strategiju i investicije, Zorica Gojak - JP Elektroprivreda Srbije, Direkcija za strategiju i investicije

    » Značaj geološke baze podataka u planiranju proizvodnje i eksploataciji uglja na površinskim kopovima EPS-a

    submitted by: DusanNenic
    Abstract text

    Sažetak: Napredak tehnike i tehnologije u svim sferama eksploatacije uglja zahtevao je formiranje i primenu jedinstvene baze geoloških podataka u Elektroprivredi Srbije. Proizvodnja električne energije se u Republici Srbiji zasniva pre svega na sagorevanju uglja u termoelektranama, a da bi se taj proces održao i unapređivao potrebna je stabilna proizvodnja lignita iz površinskih kopova. U tom cilju, geološka baza podataka je kao programsko rešenje jedan od bitnih alata u racionalnom i planskom korišćenju ugljenih resursa zemlje. Osim toga ova baza omogućava trajno skladištenje geoloških podataka dobijenih istraživanjem i njihovu višenamensku primenu od strane klijenata.

    Importance of geological database in planing of production and exploatation of coal at EPS open-cast mines

    Abstract: Advancement of engineering and technology in all aspects of coal mining required forming and applying common geological database in Electric Power Industry of Serbia. Electricity generation in the Republic of Serbia is primarily based upon coal combustion in thermal power plants, and in order to maintain and improve this process it is necessary to achieve stable coal production from open-cast mines. In this regard, geological database as a software solution is one of important tools in rational and planned usage of coal resources of the country. Moreover, this database enables permanent storage of geological data obtained by exploration and its multipurpose appliance by clients.

  • Branko Jevtić - JP Elektroprivreda Srbije, Direkcija za strategiju i investicije

    » УГАЉ СТРАТЕШКИ ЕНЕРГЕНТ ЕЛЕКТРОПРИВРЕДЕ СРБИЈЕ

    submitted by: BrankoJevtic
    Abstract text

    Апстракт:

    Значајан део инсталисанох капацитета за производњу електричне енергије у Електропривреди Србије свој рад базира на угљу као домаћем енергенту, који својим доказаним и перспективним резервама, и даље представља ослонац енергетског система Србије.

    Инсталисани капацитети термоелектрана на угаљ је 5171 МW сa просечном укупном годишњом производњом од 23 400 GWh/год. За шта је потребно обезбедити производњу угља од 32 мил. тона годишње.

    Сложенa геолошкa грађa угљених басена ЕПС-а, физичко-хемијске карактеристике, технолошки фактори експлоатације лигнита са једне старне и потреба термоенергетских капацитета ЕПС-а за стабилном и континуираном производњом овог енергнта са друге стране, стратешки опредељују потребу за што бољим искоришћењем лигнитског ресурса а тиме и ефикаснијим радом термоенергетских капацитета Електропривреде Србије.

    COAL AS THE STRATEGIC ENERGY RESOURCE OF

    ELECTRIC POWER INDUSTRY OF SERBIA

    Abstract:

    Significant part of installed capacities for electricity generation in Electric Power Industry of Serbia bases its operation on coal or domestic energy sources, still representing the support of the entire Serbian power system with its proven and perspective reserves.

    Installed capacities of coal fired thermal power plants is 5171 MW with average total annual generation of 23 400 GWh. Consequently, coal production of 32 million tons a year should be provided.

    Complex geological structure of EPS mining basins, physical – chemical characteristics, technological factor of lignite mining on one hand and the need of EPS thermal power capacities for stabile and continuous production of this energy source on the other hand, orient in strategic terms the need for best possible utilisation of lignite as well as efficient operation of thermal power capacities of Еlectric power industry of Serbia.

  • Vojin Čokorilo - Faculty of Mining and Geology, University of Belgrade, Nikola Lilić - Faculty of Mining and Geology, University of Belgrade, Miodrag Denić - Public Company for Underground Coal Exploitation, Resavica, Vladimir Milisavljević - Faculty of Mining and Geology, University of Belgrade

    » ANALYSIS OF PROPOSAL FOR CONSTRUCTION OF NEW ŠTAVALJ COAL MINE AND THERMAL POWER PLANT AND SUGGESTION FOR IMPROVEMENT AND RATIONALIZATION

    submitted by: VojinCokorilo
    Abstract text

    Štavalj deposit has over 180 million tonnes of coal reserves, which is considered by the Ministry of Mining and Energy as large energy potential of national importance. Pre Feasibility study was developed for the purpose of evaluation of new underground coal mine and thermal power plant complex.

    Mine is designed with two sets of mechanized longwalls, for the production rate of 2.3 million tonnes per year of run-of-mine coal or 1.68 million tonnes of clean coal. This production is sufficient for thermal power plant of 320 MW, based on 2 circulated fluidised bed combustion boilers and one steam turbine.

    Following review of the Pre Feasibility study, possibilities for further improvement of underground coal mine are suggested. These improvements comprises of operation with one larger mechanized longwall set and without coal processing plant. Effects of these suggestions are lower initial investments, lower roadway development requirements and smaller number of workers, all of which contributing to reduction of capital and operational expenditures and lower cost of fuel.

  • Dragan Jeremić - Rudnik i TE Gacko

    » Analiza razvoja energetskog basena Gacko

    submitted by: DraganJeremic
    Abstract text

    Namjera ove analize je definisanje potencijala gatačkog energetskog basena i određivanje optimalnog razvoja kapaciteta za proizvodnji uglja i električne energije. Osnovni projekti razvoja energetskog basena Gacko su:

    - revitalizacija postojeće TE Gacko I,

    - izgradnja nove TE Gacko II i

    - proširenje kapaciteta Rudnika uglja, PK Gacko.

    Analiza je bazirana na utvrđivanju kapaciteta ekonomski isplativih količina uglja za eksploataciju, definisanju optimalnih ulaganja i vremenskih resursa u postojeću TE sa aspekta preostalog životnog vijeka, ekološke legislative, efikasnosti i pouzdanosti funkcionisanja, te mogućnosti i ograničenja u procesu izgradnje nove termoelektrane uz definisanje visine investicije, ekonomsko- enegrgetskih pokazatelja i uticaja na životnu sredinu.

    Posebni ciljevi, kriterijumi i preduslovi optimizacije Projekta razvoja energetskog basena Gacko su:

    - Funkcionisanje termoelektrane Gacko I i izgradnja nove termoelektrane Gacko II koja će optimalno

    koristiti ekonomski isplative eksploatacione rezervi lignita rudnika PK Gacko,

    - Optimalna tehnička rješenja koja rezultuju u najmanjim cijenama proizvedene električne energije po MWh ,

    - Lokacija nove termoelektrane u najvećoj mogućoj blizini termoelektrane Gacko I uz

    maksimalno korišćenje postojećim objektima.

    - Otvaranje rudnika PK Gacko na takav način da obezbjeđuje sigurnu proizvodnju

    uglja po povoljnim cjenama (ugalj ekonomski isplativ za eksploataciju).